|
![]() |
||||||||||||||||||||||||
|
TECHNICAL | Introduction | Acoustic & Thermal | Frame | Size & Shape | Off-site volumetric modular construction is not appropriate for all project applications. At the upper limit the volumetric modular content in any scheme can amount to around 75% of the total build cost. At the lower limit, any scheme with less than 35-40% volumetric modular content by value may best be constructed using another form of build.
|
|
|||
|
|
||